•Six Global Positioning System (GPS) sensors were installed in 2004 near South Peak
GPS AND EDM
•Ten reflective prisms were installed in 2004 on Turtle Mountain’s east face.  An additional 12 to be installed in summer 2007
In summer 2004 the infrastructure was put in place for a electronic distance measurement (EDM) system and a differential global positioning system (dGPS).   This system will be completed in summer 2007 and will comprise of 4 common pillars with both GPS and EDM prisms, 2 installations with just dGPS receivers and up to 20 locations of prisms on the face of the mountain.  The distance between the prisms and a fixed robotic total station (survey instrument), located in the base of the valley, will be repeatedly recorded so that point source deformations can be observed.  The locations of these prisms will be tied in with the prisms on the combined GPS/EDM pillars to get absolute locations of the prisms, thus minimizing the requirement for atmospheric corrections.